
2-7
Version 5.3 Upgrade ProceduresSE 6000 Security Management System
2. Close all Windows applications (e.g. Reflection).
3. Double click the OpenLink icon and the OpenLink group window appears.
4. Double click VBdemo and the VB Demo dialog box appears.
5. Select the ConnectionðAdd New Connection menu and the SQL Data Sources dialog
box appears.
6. Select Unify2000 and click OK. The OpenLink ODBC dialog box appears.
7. Verify that Polaroid appears in the Username field. If not, type Polaroid in it and click OK.
8. Type Polaroid in the Password text box and click OK. A message appears indicating that
communication is established with the SE 6000. Click OK.
If any error message appears, stop the test and contact WSE Customer Service for
assistance.
9. Click Tables and the SE 6000 database tables, starting with ABAconfig table appears. If
these tables do not appear, stop the installation and contact WSE Customer Service for
assistance.
10. Click Disconnect and VB Demo dialog box appears, explaining that Connection to Unify2000
is Closed. Click OK.
11. Select the FileðExit menus and the OpenLink group window appears.
12. Close the OpenLink program group window. This conclude the test of the ODBC to SE 6000.
Phase 6 Starting Up and Testing the ID-4000
You can accomplish this phase in two parts:
n Part 1 Verifying the Restored Badges and Graphics
n Part 2 Testing the ID-4000 Application
Part 1 Verifying the Restored Badges and Graphics
1. Restart Windows.
2. From the Program Manager window, select the Polaroid ID-4000 program group.
3. Double click the Application Builder icon and the Password Protection dialog box appears.
4. Type Polaroid in the Enter Password text box and click OK. The Polaroid Application
Builder dialog box appears.
Comentarios a estos manuales